Hi Kiran
There are existing cost centers (1000+) in ECC with validity date 01012003 to 31122099.
I want to do intial upload for then in MDG.
How to do this as dont want to date as 31129999 as per edition?
I know we can create two editions with one with 31129999 load date first and again create new edition with valid from date 01012100 and load same data again. So that data lies in two valiodity periods one is 31122099 and second validity is 31129999. But I dont want second validity period at all . How to achieve this?